Smith Road Sidewalk

Project Description:

A new sidewalk will be constructed from Everett Road to Andover Boulevard on Smith Road, and a portion of Smith Road will be improved with curb and gutter. The sidewalk will connect the greenway on Everett Road to existing sidewalk on Andover Boulevard.

Project Designer:

Urban Engineering, Inc. 

Construction Contractor: Whaley Construction

Project Schedule:


Contract Bid: January 2021
Begin Construction: Summer 2021
Project Completion: October 2021

Status:

Construction substantially complete.  Punchlist on-going.