Improved Pedestrian Crossings at Grigsby Chapel Road and Watt Road

Mid-block pedestrian crossings will be installed at Grigsby Chapel Road at the Grigsby Chapel Greenway and at Watt Road near Mayor Bob Leonard Park. The Grigsby Chapel Road crossing will add flashing beacons to an existing island. The Watt Road crossing will include sidewalk connections from Lady Slipper Lane to Jones Automotive, from Sedgefield Road to a mid-block crossing of Watt Road and from the mid-block crossing to the northern entrance of Mayor Bob Leonard Park; it will also include a an island within the center turn lane with flashing beacons.

Project Designer: 

      To be determined

Project Schedule:

     Bid opening: Spring 2019

     Expected completion date: Fall 2019