Project Description: This project includes the re-construction of Campbell Station Road from Snyder Road to Ridgeland Drive, to allow for three-12' lanes, bikes lanes, curb & gutter, sidewalk and an 8' walking trail.

2016 Status: At this time, this project is budgeted only for preparation of a Transportation Planning Report (TPR) and Preliminary Engineering (PE). If the TPR finds justification for the project, final engineering design and construction will be funded.